2017-2018    MSPP Project    Oman    Onshore   
Validated the AUT inspection systems used on the Muscat to Sohar Product Pipeline project. Written the AUT validation report to verify the AUT accuracy with RT and macro sectioning. Performed AUT data review and monitored operator/system performance.

2018-2019    Leviathan Project    Israel    Offshore   
Represented the client with AUT auditors on board different pipe-lay vessels during the entire offshore pipeline installment phase. The activities consists of witnessing the NDT inspections during qualification and pipe-lay activities.

2018-2019    Fluxys LNG Tank 5    Belgium    Onshore   
Hands-on involvement during the inspection of the 9%Ni inner storage tank. Sectorial Phased Array inspection with compression and shear wave transducers was used for the examination of the course grain and an-isotropic weld material

2018-2019    Yanbu - North Jeddah Pipeline    Kingdom of Saudi Arabia    Onshore   
Auditing of AUT vendor to confirm correct inspection is carried out and procedures are adhered to.

2018-2020    Nord stream 2 Project    Russia    Onshore
Procedure, Calibration block design, system set-up, personnel review during startup phase. Guidance of the validation process in Russia. Verification of the sizing accuracy and compilation of the AUT validation report. Data review during production.

2019    Rabigh-Jedday Water pipeline project    Kingdom of Saudi Arabis    Onshore   
AUT data review. Check if AUT data interpretation and acceptance criteria were followed in accordance to the approved AUT inspection procedure.

2019    Shell Refinery Netherlands    Netherlands    Onshore   
Investigate and report how to qualify/ validate new proposed NDT techniques in combinations with technicians for the NDT during the maintenance phase.

2019    C4Gas    Czech Republic    Onshore   
Document review of client specification, codes and AUT procedure. Site visit the audit the NDT performance on site in relation to the agreed acceptance criteria. Presented all finding to end client and all sub-contractors involved.

2019-2020    Future growth Project    Scotland    Onshore   
Review of PAUT inspection procedures and inspection performance on heavy wall thickness F22 material. Clarification of the acceptance criteria to be used. Data review of inspection data during WPQ's. Development of PAUT calibration/ validation block.

2019-2020    Lillebaelt Project    Denmark    Onshore   
Represented the client with AUT auditors during phase. The activities consists of witnessing the NDT inspections during welding activities. Reviewing and of reports and data interpretation.

2020    Noble Tamar Project    Israel    Offshore   
Represented the client with AUT auditor on board  pipe-lay vessels during the entire offshore pipeline installment phase. The activities consists of witnessing the NDT inspections during qualification and pipe-lay activities.

2020    Mogus Tamar Project    Netherlands    Onshore   
Fabrication Acceptance Test of in-service deep-water UT inspection pipeline tool.

2020    Kirinskoye Project/ Midia Gas/ BP Platina    Netherlands    Offshore   
Supported Applus RTD Rotterdam - pipeline division. Guiding and supporting  new NDT engineers during system qualifications.

2020-2021   Anja Project   Germany   Offshore
ANDTI-BV was responsible for all NDT during this offshore campaign supplying 21 technicians, including PAUT supervisors, operators and scanner technicians. ANDTI-BV gained full DNV PAUT system qualification.

2021    Funen Project    Denmark    Onshore   
Reviewing of PAUT inspection procedures as level 3.

2019-2023    Canada LNG    Canada    Onshore   
Development of PAUT and MUT inspection procedures and calibration block designs for austenitic weld material in combination with 9%Ni base material. Prepared the technical justification, system qualification program as well as the personnel blind test validation.
Currently act as Level 3, reviewing all data and reports.

2022-2024   Cladded Pipeline Project   China   Onshore
Development of PAUT inspection procedures and AUT calibration block design. Provided local PAUT training for the examination of austenitic weld material.

2023   Turnaround BP,   Lingen   Germany
Supplied Project management for large Turnaround having up to 130 NDT technicians working on site.

2023   Zuluf BQ Project   Kingdom of Saudi Arabia   Onshore
Auditing AUT contractor on site as level 3.

2023-Ongong   Rosmari and Marjoram Project   Malaysia   Onshore/ Offshore
AUT client representative for Shell Malaysia during the WPQ, WQT and AUT system validation.

2024   Turnaround ExxonMobil,   Rotterdam Botlek   The Netherlands
Supplied Project management for Turnaround